beautypg.com

Chapter 2: physical setup, Chapter 2, Physical setup – Grass Valley Network Attached Storage System Serial ATA Network User Guide v.1.0.04 User Manual

Page 26

background image

Digital News Production

25

Chapter

2

Physical Setup

This chapter explains the physical setup of the NewsShare NAS system with
two server nodes. (The NewsShare NAS system is available with one server
node as well. Setup for one server node is similar.) The steps listed below are
described in detail on the following pages:

1. Unpack the PFR-600 array. Refer to the PFR-600 Instruction Manual, Part

No. 071826600.

2. Attach the sever nodes, as described in “Server Nodes” on page 26.

3. Attach the Database System Manager.

4. Cable the system as follows:

- Cable the PFR-600 to the NewsShare NAS servers.

- Cable the DSM to the servers.

- Cable the server nodes to a switch or a hub that is attached to a host

system.

- Cable the NewsShare system to a NewsEdit workstation.

5. Power up the NewsShare NAS components.