beautypg.com

Grass Valley Branding Panel User Manual

Page 56

background image

RCP-BR: Guide to Installation and Operation

Page 48

Miranda Technologies Inc.

To shut down the unit press the ‘Shut Down’ button. This will then display the
options to confirm or cancel the shut down as shown in figure 3-27.

Figure 3-27

Shut down confirmation


Similarly if the Restart button is pressed it will display the Confirm/Cancel
buttons and selecting the Confirm option will restart the RCP-BR panel.

Pressing the ‘Switch to control window’ button will display the control window
as shown in figure 3-28.

Figure 3-28

Control window


The control window allows the operator to:

1. Access the Windows task manager.
2. View the web interface connected to the RCP-BR panel.
3. Restart or shutdown the RCP-BR. Please note that these can be carried

out directly from the System panel.


To close the control window press any area of the touchscreen outside the control
window.