beautypg.com

Grass Valley Aurora Ingest v.7.0.0 User Manual

Page 158

background image

10. Lastly, change the Status from Confirmed to Unconfirmed. The status will be

automatically changed to Confirmed once Scheduler verified that no time conflicts
exist on the scheduled event.

11. Click

OK

.

The Work Order is created and you can see the event on the ScheduALL
interface.

12. You can see the event created on ScheduALL appears automatically on the

Scheduler interface.

158

Aurora Ingest System Guide

14 April 2010

Using Aurora Ingest - Scheduler