Installing FHO Software
Before You Begin
Page 3-2
MDE-5079 Gasboy Fleet PLUS Installation and Implementation Guide to Passport Authorization Server (PAS) · December 2013
2-4 Weeks
Do you have another solution to
access your server other than Remote
Desktop?
The software cannot be installed via remote desktop and
access by remote desktop may interfere with the HASP’s
ability to pass the license keys. Therefore, solutions such as
VMware viewer, TeamViewer, or VNC should be employed.
2-4 Weeks
Ensure Passport Requirements are
met for PAS installations.
Passport version must be 8.02 or later and have the
Enhanced Loyalty Feature Bundle activated.
2-4 Weeks
Network Connectivity between the site
and FHO?
Network connectivity between the PAS and FHO must be
present on the day of install.
2-4 Weeks
Have static IP addresses have been
assigned for the FHO and site
equipment?
Each PAS or SiteOmat must have an assigned static IP
address.
2-4 Weeks
Do you have all the PIN codes for your
customers?
PIN codes can be entered from a list or can be generated by
Gasboy if you know your card numbers.
2-4 Weeks
Do you have an electronic card file?
If you have more than 150 devices, you may find it easiest
to import your card file rather than manually entering it.
1-2 Weeks
Is your card file complete?
Have you compiled the card/driver/vehicle/limit
codes/ product codes/authorization codes you will need to
load into the FHO?
1-2 Weeks
Is the FHO Installed?
Has the software been obtained from the Gasboy FTP
server and installed on the FHO server?
1-2 Weeks
Have you created the template for
your import file?
Have you entered few devices through the Graphic User
Interface (GUI) that represent each of your group rules and
price lists?
1-2 Weeks
Is Gilbarco ASC is scheduled to do the
site install?
Do you have an installation date?
1-2 Weeks
Is IT staff scheduled to be available on
the day/time of install?
You will need someone who can troubleshoot any network
and SQL issues.
1-2 Weeks
Is fleet staff is scheduled to be
available to conduct polling/period/
historical reporting before removing
the old system?
The person managing your current system should be
present on the day of install to gather all transactions before
the old system is removed (if a retrofit).
1-2 Weeks
Review operation documentation.
MDE-4821 Fleet Head Office System Installation and User’s
Manual
Day of install IT staff representative is available.
Prepared to connect to the site and troubleshoot as needed.
Day of install Information is provided to the installing
technician at the site.
Static IP address, Subnet, Gateway, Site Number, and Site
Name.
Day of install All items on day of install checklist are
completed.
Day of install Polling site/running period and
historical reporting that may be
needed.
The person managing your current system should be
present on the day of install to gather all transactions before
the old system is removed (if a retrofit).
Note: An invalid card file may only be found on the day of installation and may result in having to roll back the
Passport System if cards cannot be accepted.
Time Before
Install
Task