beautypg.com

3 installation and functional test, 1 unpacking, 2 power requirements – AMETEK 2001RP User Manual

Page 22: 3installation and functional test

background image

User and Programming Manual - Rev R

12

2001RP

3

Installation and Functional Test

3.1 Unpacking

Inspect the unit for any possible shipping damage immediately upon receipt. If damage is
evident, notify the carrier. DO NOT return an instrument to the factory without prior
approval. Do not destroy the packing container until the unit has been inspected for damage
in shipment.

3.2 Power Requirements

The AC Power System has been designed to operate from a single phase AC line voltage.
The nominal operating voltage is either 120V or 230V line input. The 2001RP line input
setting is shown on the type sticker located on the rear panel.

Figure 3-1: Model 2001RP AC Power Source

WARNING:

Do not connect the unit to a 400-480 service, as the result will be a severely
damaged unit.

Do not connect the unit to AC line input unless the nominal line input settings
match those of the available AC line voltage.