Deleting maximum demand, Maximum demand integration period – CIRCUTOR CVM-C10 Series User Manual
Page 41

Single-phase network measurement, phase to neutral, with a 2-wire connection.
To validate the data, press
for 3 seconds and the
prog icon will disappear from the display.
Press key
to access the next programming step.
4�9�9� Maximum demand integration period
The maximum demand integration period is programmed in
minutes on this screen.
Press key
for 3 seconds to edit the integration period value.
The
prog icon will be displayed on the bottom of the screen.
To enter or modify the value, press the
key repeatedly,
increasing the value of the flashing digit.
When the desired value is shown on the screen, move onto the next digit by pressing the key
to modify the other values.
If you press the
key after changing the last digit, it will jump back to the first digit so you
can modify the previously programmed values again.
To validate the data, press
for 3 seconds and the
prog icon will disappear from the display.
The programmed value will be deleted if the entered value is higher than the maximum
programming value.
Maximum programming value: 60.
Minimum programming value: 1.
Press key
to access the next programming step.
4�9�10� Deleting maximum demand
On this screen you select whether or not to delete the maximum
demand.
Press key
for 3 seconds to edit the deletion selection. The
prog icon will be displayed on the bottom of the screen.
Press key
to browse the two deletion options: Yes or No.
To validate the data, press
for 3 seconds and the
prog icon will disappear from the display.
Press key
to access the next programming step
41
Instruction Manual
CVM-C10