beautypg.com

Secundary neutral current (model cvm-c10-itf-in), Number of quadrants, Type of installation – CIRCUTOR CVM-C10 Series User Manual

Page 40: Type of installation” )

background image

4�9�6�Secundary neutral current (model CVM-C10-ITF-IN)

The neutral current transformer secundary is programmed on this

screen.
Press key

for 3 seconds to edit the transformer secundary

value. The

prog icon will be displayed on the bottom of the

screen.

Press key

to browse the two possible options for the current

transformer secondary (1A or 5A).

To validate the data, press

for 3 seconds and the

prog icon will disappear from the display.

Press key

to access the next programming step

4�9�7� Number of quadrants

The quadrant number on which the unit takes the measurement

is selected on this screen.

Press key

for 3 seconds to edit the number of quadrants. The

prog icon will be displayed on the bottom of the screen.

Press key

to browse the two options:

2 or 4 quadrants.

To validate the data, press

for 3 seconds and the

prog icon will disappear from the display.

Press key

to access the next programming step

4�9�8� Type of installation

The type of installation is selected on this screen.

Press key

for 3 seconds to edit the type of installation. The

prog icon will be displayed on the bottom of the screen.

The

key is used to browse the different options

Three-phase network measurement with a 4-wire connection.

Three-phase network measurement with a 3-wire connection.

Three-phase network measurement with a 3-wire connection and

transformers with an ARON connection .

Two-phase network measurement with a 3-wire connection.

Single-phase network measurement, phase to phase, with a 2-wire connection.

40

CVM-C10

Instruction Manual