Caution – BINDER MK 115 User Manual
Page 34
MKF + MKFT (E3.1) 07/2014
page 34/114
4.2.3 Water circle: lever for condensate recycling (option)
Figure 9: Lever for condensate recycling (open position)
next to the freshwater can behind the maintenance access door
The lever (19) for condensate recycling is located behind the maintenance access door next to the fresh-
water can.
•
Open lever (vertical position): the condensate from the interior is conducted to the freshwater can. Use
only with clean interior!
•
Closed lever (horizontal position): the condensate is conducted to the wastewater connection. Use this
position in case of soiling / contamination of the interior.
CAUTION
Soiling of the vapor humidification system.
Damage to the unit.
Conduct the condensate to the wastewater connection in case of soiling / contamina-
tion of the interior (horizontal lever position).
(19)