beautypg.com

3 getting started with your fiber guardian, Preventing electrostatic discharge damage, 3getting started with your fiber guardian – EXFO FG-750 User Manual

Page 37: Arning

background image

Fiber Guardian

23

3

Getting Started with Your

Fiber Guardian

The installation process can be divided into the following main steps:

Preparing for installation

Installing the unit in a rack

Connecting the devices

Turning on the unit

Connecting cables to the optical ports

Preventing Electrostatic Discharge Damage

Electrostatic discharge (ESD) damage can cause complete or intermittent
equipment failures. Always use an ESD-preventive wrist or ankle strap and
ensure that it makes good skin contact. Connect the equipment end of the
connection cord into the ESD connector located on the front of your unit
(see Available Models on page 3).

All procedures for which the use of an antistatic strap is recommended will
be identified as such throughout this documentation.

W

ARNING

To avoid personal injuries and damages to the unit, you must
perform the procedures detailed in this section in the order they are
presented.