Carrier 07D User Manual
Carrier 06d,07d, And o, Installation instructions
Table of contents
Document Outline
- 06D,07D
- CONTENTS
- z
- 5
- 5
- 5
- o
- 5
- 5
- 5
- 5
- m
- INSPECT THE SITE Preliminary Survey
- INSPECT SHIPMENT FOR LOSS AND DAMAGE
- SET THE UNIT IN PLACE
- CODE COMPLIANCE
- ELECTRICAL REQUIREMENTS
- Water-Cooled Condensing Unit Control T ransformers
- POWER AND CONTROL CIRCUIT SCHEMATIC
- Fig, 14 - Wiring Label 07D Condensing Units, 06D Compressor Units (3-Phase)
- Fig. 16 - Field Wiring for 06D, 07D Units
- Fig. 16 - Field Wiring for 06D, 07D Units (Confd)
- PIPING AND ACCESSORIES
- Elimination of Pipe Vibration
- Time Guard Control Operation
- Starting Sequence of Time Guard Control (Single Pump-Out Arrangement Shown)
- Operating Condition of Time Guard Control (Single Pump-Out Arrangement Shown)
- Stopping Sequence of Time Guard Control (Single Pump-Out Arrangement Shown)
- Shut-Off Valves
- Crankcase Heater
- Liquid Line Strainer-Drier
- Flare Connections
- Soldering and Brazing Piping to Valves
- Water Regulating Valves (Water-Cooled Units Only)
- Liquid Line Solenoid Valve (Field Supplied)
- Liquid Line Sight Glass
- Condenser Water Connections
- The Halide Leak Detector
- LEAK TEST THE SYSTEM
- DEHYDRATE THE SYSTEM Preparation
- #
- Description and Use of the Vacuum Indicator
- Procedure for Dehydrating the System
- CHECK REFRIGERANT CHARGE
- CHECKING OPERATIONS
- Dual Pressurestat
- INITIAL START-UP INSTRUCTIONS
- Water-Cooled Units
- Lubrication
- Water Valve Adjustment (Water-Cooled Units Only)
- Factory Oil Charge
- Fig. 22 - Oil Level Measurement 2 Cylinder Compressors
- 07DA210,112,215 ELECTRICALLY OPERATED CAPACITY CONTROL DEVICE
- Solenoid Valve Electrical Characteristics
- Fig. 24 - 07DA210,! 12,215 Compressor with Cylinder Head Unloading - Cylinder Bank Loaded
- m