beautypg.com

Carrier 07D User Manual

Page 2

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

06D,07D

INSTALLATION

Carrier

CONTENTS

Inspect the Site

PAGE

13

Inspect Shipment for Loss and Damage

15

Set the Unit in Place

15

Code Compliance

15

Electrical Requirements

15

Piping and Accessories

20

Leak Test the System

24

Dehydrate the System

24

Check Refrigerant Charge

26

Initial Start-Up Instructions

27

Checking Operations

27

07DA210,112,215 Electrically Operated Capacity

Control Device

28

Check the Installation

32

SUCTION

SHUT-OFF VALVE

DISCHARGE MANIFOLD

PRE5SURESTAT CONN.

PUMP END BEARING
HEAD

OIL PUMP COVER

SUCTION MANIFOLD
PRESSURESTAT CONNECTION

(REMOVE FITTING TO

CHECK OIL LEVEL WITH
DIPSTICK)

COMPRESSOR NAMEPLATE

REGISTER TAG

FUSIBLE UNION

COOLING WATER
CONN

WATER REGULATOR VALVE
PRESSURE CONNECTION

LIQUID LINE CONNECTION

liquid

line

valve

TERMINAL BLOCK

discharge

shut

-

off

valve

DISCHARGE GAGE CONNECTION

RUN CAPACITOR

CONTROL BOX

DISCHARGE MUFFLER

CONDENSING UNIT

NAMEPLATE (USE
FOR WARRANTY
PURPOSES)

MOUNTING SPRINGS

(REMOVE BOLTS BEFORE STARTING)

CONDENSER NAMEPLATE

LIQUID LEVEL TEST

COCK

Fig. 1 - Typical 2 Cylinder Water-Cooled Condensing Unit

(07DA102, Single-Phase Illustrated)