Check the installation, 06d,07d, Installation – Carrier 07D User Manual
Page 32
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

06D,07D
INSTALLATION
I 2
3
4
5
6
7
8
9
10 II 12
TURNS OUT FROM BOTTOM STOP-COUNTERCLOCKWISE
Fig. 27 - Control Set Point
234
5
6
7
8
9
10
TURNS IN FROM BACKSTOP - CLOCKWISE
To Adjust - The differential screw should be
turned counterclockwise out to the back stop. If
the desired differential is known, the number of
turns can be determined from Fig, 28.
CHECK THE INSTALLATION
After the unit has been checked for leaks, put
into operation, and all adjustments made, check
the following:
1. Make sure the shipping bolts have been re
moved from the compressor.
07DA501005
Fig. 28 - Differential Set Point
2. See that the shut-off valves are backseated.
32
3, Tighten all shut-off valve packing nuts and
replace the caps.
4, Pick up all tools and clean up around the unit.
5. Make sure there is adequate air circulation
around the unit.
6. Instruct customer in the operation of the unit.
6-65