Vent Outlet

Instructions for

Size 125

Front Flange

(Slide front flange under top

of heater; see FIGURE 3A.)

Size 125

Flue

Collar

Support

Sizes 25, 50, 75, 100, 165, and 200 - Vent is

factory assembled in the horizontal position.

Sizes 25, 50, 75, 100, 165, and 200 -

Change the position of the flue collar

assembly for a vertical vent outlet

FIGURE 2 - Vent Outlet

Positions - Sizes 25, 50,

75, 100, 165, 200

1. Remove the two center screws (one on each side) that are holding the three

flue outlet pieces in place during shipping. Use these screws and the 16 screws

(#10x1/2" sheetmetal screws) in the plastic bag.

2. Attach the Flue Collar Support - Size 125

Position the support with the opening

toward the back of the heater.

Slide the flange on the front of the flue

collar support

under the drafthood (top

of the heater).

Fasten with five sheetmetal screws.

Flue Collar Assembly

Sheetmetal Screw (4)

3. Attach the Flue Collar Assembly - Size 125

(If vent outlet is to be vertical; see Installation

Note, page 5.)

Position the flue collar assembly

over the rear opening

Fasten with four sheetmetal

screws.

FIGURE 3B - Size 125,

STEP 3 - Attach Flue

Collar Assembly

Size 125 Flue

Collar Assembly

Size 125

Flue Collar

Support

Slide the flange on the front

of the flue collar support

underneath the drafthood.

Drafthood

Sheetmetal

Screw (5)

3. Uncrating and

Preparation

(cont'd)

3.2 Preparing for

Installation

(cont'd)

3.2.2 Assembling Vent Outlet (cont'd)
Vent Outlet Instructions for Sizes 25, 50, 75, 100, 165 and 200

The heater in these sizes is shipped with the vent outlet in the horizontal position and

requires no further field preparation. However, if a vertical vent outlet connection is

needed, reverse the positions of the flat cover plate and the flue collar assembly. See

FIGURE 2.

A size 125 heater always requires field assembly of the vent outlet. The three sheet-

metal pieces and a parts bag including the instructions and screws are shipped attached

to the drafthood of the heater.

FIGURE 3A - Size 125,

STEP 2 - Attach Flue

Collar Support