beautypg.com

Toshiba SX 2000 User Manual

Page 145

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Chapt.4 Installation and Wiring

B

(4) Put the module along

the top / bottom leads
of base.

(5)

Push the module slowly

and vertically,
supporting the top/bottom

by hands until it clicks into

the base.

(

6

)

Mount the module securely,
using the attached module
mounting screw of M4
size.
(Screws torque: approx.
1.47N*m=15kgf‘cm)

(7) Remove the cover of modules or open the cover of terminal blocks.

Refer to Section 4.3.2 for details.

(8) Wire and connect cables with terminal blocks or connectors.

Use crimp-style terminals with sheaths.

(9) Check the wiring and confirm if the terminal blocks are secured. Then mount the

cover of modules and close the cover of terminal blocks.

1 2 8

Sequence Controller S2T