Toshiba SX 2000 User Manual
Page 145
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Chapt.4 Installation and Wiring
B
(4) Put the module along
the top / bottom leads
of base.
(5)
Push the module slowly
and vertically,
supporting the top/bottom
by hands until it clicks into
the base.
(
6
)
Mount the module securely,
using the attached module
mounting screw of M4
size.
(Screws torque: approx.
1.47N*m=15kgf‘cm)
(7) Remove the cover of modules or open the cover of terminal blocks.
Refer to Section 4.3.2 for details.
(8) Wire and connect cables with terminal blocks or connectors.
Use crimp-style terminals with sheaths.
(9) Check the wiring and confirm if the terminal blocks are secured. Then mount the
cover of modules and close the cover of terminal blocks.
1 2 8
Sequence Controller S2T