Edge Lighting TruLine 1.6A, 24VDC - Plaster-In LED system User Manual
Truline 1.6a 24vdc, Installation instructions for, Horizontal configuration

Section One: Basic Configuration Options
1
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.purelighting.com
[email protected]
© 2014 Pure Lighting. All Rights Reserved.
SAVE THESE INSTRUCTIONS!
- This fixture is wall or ceiling mount.
- This instruction shows a typical installation.
- Consult the configuration notes on Page 1 before
beginning any installation.
IMPORTANT INFORMATION
INS# 902-TL1.6A-07
Installation Instructions For
TruLine 1.6A 24VDC
Horizontal Configuration
Horizontal installations are linear runs of channel beginning at a junction box and ending at a take-up box on a single surface. Runs
can be up to 40' in length and the LED strip lays in the bottom of the channel.
Horizontal installations are typically installed perpendicular to wall studs or ceiling joists. Where no stud/joist is present (or in a
remodel installation) a mounting strap may be used to secure the channel to the drywall.
Vertical Configuration
Vertical installations are linear runs of channel beginning at a
junction box and ending at a take-up box on a single surface.
Runs can be up to 40' in length and the LED strip lays in the
bottom of the channel.
Vertical installations are typically installed between wall studs or
ceiling joists. Cross-braced stud sections or mounting straps are
suggested to provide additional support every 32".