Edge Lighting TruLine .5A, 24VDC - Plaster-In LED System User Manual
Page 16
16
24: Apply ultra-thin drywall tape along edges of channel to
prevent cracking of plaster after installation. DO NOT
overlap strips of drywall tape.
25: Use a 12" compound knife for a smooth compound spread.
Sand, paint, and finish the plaster and drywall before
removing the blue contractors tape.
NOTE:
Test the LED strip before any plaster work is done.
NOTE:
Cover the channel opening with blue contractor’s
tape before plastering.
TRAP DOOR
#6-32
SCREW
27
26
28: Line up the red wire side of the power connector with the
“+24VDC” marking on the Soft Strip. Push the male
connector of the Soft Strip into the female connector of
the power cables.
29: Carefully remove the backing from the LED soft strip, making
sure not to remove the tape from the soft strip. Firmly press
down the adhesive portion of the soft strip onto the channel
surface while removing the rest of the backing, making sure
there are no air bubbles that can cause surface irregularities.
28
29
POWER
CONNECTION
LED STRIP
PAPER
BACKING
Z35
Z32
Z33
Z34
26: Remove the blue contractor’s tape from the inside of the
channel. Clean the channel surface with alcohol to remove any
dust or debris before continuing.
27: Attach the trap door to the junction box using a #4-40 screw.
IMPORTANT: Soft strip may not properly adhere to channel
surface unless the channel is cleaned with alcohol prior to
application.