Installing the at10.1 – Exide Technologies Section 94.30 User Manual
Page 13

INSTALLING THE AT10.1
9
PROCEDURE
To rack mount the AT10.1, first install the brackets into the rack using the
supplied hardware. Second, install the AT10.1 onto the brackets. Tighten all
hardware securely. Provide at least 6in / 152mm of free air space above and
below the AT10.1 enclosure in the rack for cooling. You do not need to
modify the AT10.1 enclosures for standard rack-mounting. See the diagrams
below for the Group II enclosure rack-mounting configurations.
Style-5017 Rack-Mounting
Style-5018 Rack-Mounting
NOTES
1. Units are installed from the front.
2. Refer to the outline drawings in Appedix C for enclosure dimensions.