Installing the at10.1 – Exide Technologies Section 94.30 User Manual
Page 11
INSTALLING THE AT10.1
7
PROCEDURE
To floor-mount the AT10.1, install
four (4) 0.25in / 6.4mm bolts into
the floor. Place the AT10.1 on the
bolts, add appropriate mounting
hardware, and tighten securely. See
the diagram below for the Style-
5018 enclosure footprint and floor-
mounting pattern. Dimensions are
in/mm.
Style-5018 Enclosure
See also other documents in the category Exide Technologies Power suppliers:
- GB3565 (4 pages)
- GB3696 (8 pages)
- GB3846 (4 pages)
- GB3902 (8 pages)
- GB3912 (2 pages)
- GB3914 (2 pages)
- GB3914S (2 pages)
- GB3979 (7 pages)
- GB4007 (4 pages)
- GB4013 (8 pages)
- GB4103 (4 pages)
- GB4109 (32 pages)
- GB4127 (31 pages)
- GB4128 (19 pages)
- GB4139 (6 pages)
- GB4145 (4 pages)
- GB4146 (8 pages)
- GB4158 (8 pages)
- SCR100 Charger (38 pages)
- SCRFLX Charger (38 pages)
- SPP PowrPak Series Industrial Battery Chargers (16 pages)
- V19CIL5200ULF (28 pages)
- V19CIL5200ULS (28 pages)
- JA5009-00 (68 pages)
- Section 92.30 (18 pages)
- Section 92.61 (32 pages)
- Section 92.80 (28 pages)
- Section 93.10 (20 pages)
- Section 93.10T (11 pages)
- Section 93.20 (68 pages)
- Section 93.30 (68 pages)
- Section 94.20 (100 pages)
- Section 94.40 (100 pages)
- Section 95.10 (18 pages)