beautypg.com

Metrohm 761 SD Compact IC User Manual

Page 91

background image

5.1 Operation with manual sample change

761 SD Compact IC / Instructions for Use 8.

761.1043

83

3 Sample determination

Click on the yellow <Sample> button at the top right so that

it changes to the green <Start> button.

System

manual.smt

should still be set in item

System

from cali-

bration. If not, set it.

Choose type "Sample" for item

Run Type

.

Enter the name of the sample for item

Ident

.

Insert the free (dry) end of the sample aspirating tubing 3 into

the sample vessel.

Start the determination by clicking on the green <Start> but-

ton. Answer the prompt

Sample ready?

and allow the determi-

nation to run through to the end.

5.1.2.3

Shutdown (manual operation / «IC Cap»)

In order to avoid damage to the instrument, it should be rinsed with

water before shutting down after the end of sample determination.

This rinsing operation should be performed with system

shutdown.smt

(see Section 3.2.4).

1 Settings

Click on the yellow <Sample> button at the top right so that

it changes to the green <Start> button.

Choose system

shutdown.smt

for item

System

.

Choose type "Sample" for item

Run Type

.

Enter “Shutdown” for item

Ident

.

2 Allow shutdown.smt to run

Insert the free end of the sample aspirating tubing 3 into a

container filled with water.

Start the system by clicking on the green <Start> button.

Answer prompt

water as last sample?

(answer should be yes!)

and allow the determination to run through to the end (7.10

minutes). High-pressure pump and peristaltic pump are

switched off automatically at the end.