The process plans for the seat assembly contain a single subassembly operation. In this
operation, the previously manufactured seat post and purchased seat are assembled. The
subassembly is then placed in inventory where it is available for demand from a final
assembly order. The component parts required for this subassembly are a seat post and
seat for each subassembly to be produced. The process plan for Seat Assembly is
summarized below.
Seat Assembly Plan
S
EAT
P
OST
The process plans for a seat post contain two operations: cut and machine. The completed
seat post is then placed in inventory to be used by orders for seat assemblies. The raw
materials required at the cut operation have not been included in the process plan as the
material-planning replenishment process at the MRP level assures that adequate materials
will be available. The process plan for Seat Post is summarized below.
Seat Post Plan
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Assemble
Seat and
Post
Subassembly
0.20
0.084
Labor (1)
Seat and Seat Post
required;
Place in inventory
10
ASSEMBLE
SEAT AND
POST
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Material
Consumed
Material
Produced
10 Cut
Seat
Post
Cut
0.17
0.068
20 Machine
Seat Post
Machine MM 0.130
Seat
Post
10
CUT SEAT
POST
20
MACHINE
SEAT POST