Ssd blue finished frame, Shp frame, Ssd b – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual

Page 114: Shp f

background image

F

ACTORY

T

ALK

S

CHEDULER

U

SER

S

G

UIDE

108

• •

SSD B

LUE

F

INISHED

F

RAME

SHP F

RAME

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Finish

SSD

Blue Frame

Finish 0.11

0.155

SSD

Frame

required

20 Assemble

SSD Blue
Frame

Subassembly

0.19

0.083

Labor (1)

Place in
inventory

10

Finish SSD

Blue Frame

20

Assembly
SSD Blue

Frame

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Cut SHP Frame

Tubing

Cut 0.36

0.12

20 Bend SHP Frame

Tubing

Bend BM

0.154

30 Machine

SHP

Frame Tubing

Machine MM

0.211

40 Weld SHP Frame

Weld

WD

0.234

Place in inventory

10

Cut SHP

Frame Tubing

20

Bend SHP

Frame Tubing

30

Machine SHP

Frame Tubing

40

Weld SHP

Frame