Finished frame, Frame – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual
Page 23

3
•
T
HE
F
ACTORY
O
VERVIEW
17
•
•
•
• •
The components required before this operation can be started are the manufactured parts
SHP Red Finished Frame, Handlebar Assembly, and Seat Assembly and the purchased
parts Pedal and Chain Assembly, Wheels, Derailleur Assembly, and Brakes.
F
INISHED
F
RAME
The process plans for a finished frame (SHP Red, SHP Blue, SSD Red, and SSD Blue)
contain two operations. The frame parts are first finished (red or blue) and then the parts
are subassembled. The finished frame is then placed in inventory where it is available for
demand from a final assembly order. The process plan for SHP Red Finished Frame is
summarized below.
SHP Red Finished Frame Plan
F
RAME
The process plans for a frame (SHP or SSD) contain four operations: cut, bend, machine,
and weld. The frame is then placed in inventory to be used by orders for finished frames.
The raw materials required at both the cut and weld operations have not been included in the
process plan as the material-planning replenishment process at the MRP level assures that
adequate materials will be available. The process plan for SHP Frame is summarized next.
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Finish
SHP
Red Frame
Finish 0.11
0.155
SHP
Frame
required
20 Subassemble
SHP Frame
Subassembly
0.19
0.083
Labor (1)
Place in
inventory
10
FINISH
FRAME
20
ASSEMBLE
FRAME