beautypg.com

Startup/power on – Rockwell Automation 2727-G7P20D1Q7 MobileView Guard G750 Quick Start User Manual

Page 24

background image

24 MobileView Guard G750

Publication 2727-QS002E-MU-P

Startup/Power On

1. Attach the MobileView Connection Cable to the Junction Box Cable as

shown on page 14. Tighten threaded coupling until it is finger tight.

2. Check the MobileView terminal for a start-up screen.

If the start-up screen does not appear, check the 24V dc power source and
cable connections at the Junction Box and MobileView terminal.

TIP

An icon for RSView ME software appears on the MobileView
2727-G7P20D1Q6 and 2727-G7P20D3Q7 start-up screens only.