beautypg.com

Header attaching & detaching – MacDon 873 Combine Adapter User Manual

Page 12

background image

Form # 147069

Issue 09/06

10

HEADER ATTACHING & DETACHING

ATTACHING HEADER TO COMBINE AND ADAPTER

(continued)

CAUTION: Always connect top link

before raising header.

9. Raise adapter slowly, making sure adapter

legs engage in header legs. Continue to lift

until header is fully raised. Stop engine and

remove key.

DANGER: To avoid bodily injury

from fall of raised header, engage

header lift cylinder stops when

working on or around raised

header. See your Combine Operator's Manual

for details.

10. Ensure adapter leg is properly engaged in

header lower leg as follows:

963, 972 & 973 Headers: Adapter leg must

engage in vibration isolator support at (C),

both sides.

974 Flex Headers: Adapter leg must engage

in header float channel (D), both sides.

11. Install clevis pins (B), stored in step 5, to lock

adapter to header, both sides. Install lynch

pins to capture clevis pins.

12. Remove clevis pin from adapter float and

move handle down to “float engaged” position

(E). Replace clevis pin and install lynch pin to

capture clevis pin. If pin is tight, extend top link

to free it up.

Repeat at other leg.

B

INSTALL PINS TO LOCK ADAPTER TO

HEADER

ADAPTER LEG MUST BE ENGAGED IN

SUPPORT/CHANNEL – BOTH SIDES

D

FLOAT LOCKOUT

FLOAT ENGAGED

ADAPTER FLOAT

E

C