Operation pre-starting checks: annual – MacDon 9352c SP User Manual
Page 32

Form # 147459
Issue 11/06 Web Rev_01
30
OPERATION
 
Pre-Starting Checks: Annual 
 
Do the following at the start of each operating 
season: 
 
 
CAUTION: 
 
 
1. Review the Operator's Manual to refresh
your memory on safety and operating 
recommendations. 
 
 2. Review all safety signs and other decals on 
the windrower and note hazard areas.
 
 3. Be sure all shields and guards are properly 
installed and secured. Never alter or 
remove safety equipment. 
 
 4. Re-acquaint yourself with the controls 
before beginning operation.
 
 5. Store a properly stocked first aid kit and 
charged fire extinguisher on the 
windrower. 
 
Also: 
 
 6. Drain off excess hydraulic oil added for stor-
age. See "Hydraulic System" in Maintenance/ 
Service section. 
7. Remove plastic bags and/or tape from all
sealed openings (air cleaner intake, exhaust 
pipe, fuel tank). 
8. Charge battery and install. Be sure terminals
are clean and cables are connected securely.
9. Adjust tension on A/C compressor belt. See
Maintenance/Service section.
10.
Cycle blower switch to distribute A/C 
refrigerant oil. See Maintenance/Service 
section. 
11. Perform all Annual maintenance. See Main-
tenance/Service section.
