5

IModel UH130, UH130B, UH230, UH230B - Installation

Booster Heater Element

Field Conversion from Single to Three Phase Operation

WARNING:

Electrocution or serious injury may result when working on an

energized circuit.
Disconnect power at the main breaker or service disconnect switch

before working on the circuit.
Lock-out and tag the breaker or service disconnect switch to

indicate that work is being performed on the circuit.

(Three Phase) Electrical Connections -

UH130, UH130B, UH230, UH230B

(continued)

Field Conversion from Single to Three Phase Operation

To convert the booster heater from single phase to three phase operation, locate

the booster wire labeled 1H3 cable-tied to the booster hose. Remove the shrink

insulation from the terminal and connect to the booster heater element as shown

on the wiring diagram on page 6.

The three phase booster wire (1H3) is cable-tied to the hose adjacent to the booster tank.