beautypg.com

Installation – Eppendorf Biological Shakers Innova 44R User Manual

Page 23

background image

23

Biological Shakers Innova® 44/44R — Operating manual

3. With two assistants guiding the unit from opposite sides, lower the shaker onto the mounting

brackets, back end first. Slowly and gently remove the forklift or lifter, lowering the front of the
unit onto the mounting brackets by hand.

4. As shown (see Fig. 10 on p. 23), secure the bottom of the upper shaker to the mounting

brackets (already fastened to the shaker below) with the screws, lock washers and washers
provided.

Abb. 10:

Stacked Shakers

Fig. 10:

Stacked Shakers

5. Make sure the shakers are level; add metal shims under the bottom unit (or base) if needed.
6. After installing a platform (see Getting started on p. 32), fully load the shaker and do a test run

at normal speed (see Start the shaker on p. 37). Make additional leveling adjustments if
necessary.

If you are stacking a third shaker, (see Stack a third shaker on p. 24).

Incuba tor Sha

ker Se ries

Incuba tor Sha

ker Se ries

NEW BRUNS

WICK SCIENTIFIC

NEW BRUNS

WICK SCIENTIFIC

6

Installation

This manual is related to the following products: