beautypg.com

3 startup, 2 device description – Eppendorf FemtoJet User Manual

Page 12

background image

10

2 Device description

2.3 Startup

Diagram of rear of device

Electrical connection is effected via the mains socket with integrated
mains switch (1).

Connection to an Eppendorf manipulator designed for injection is
effected via the 15-pin interface (2).

Optional switches (e.g. foot control, hand control) or a computer can
be connected to the 9-pin interfaces.

Switching on the device

Set the mains switch on the rear of the device to "I". The unit is switched
on, the display lights up, the unit runs through a warm-up routine and is
then ready for operation. The injection mode is shown in the display.

The injection tube may not be connected when switching on and during
the initialization phase.

After being switched on, the unit runs through an initialization phase and
supply pressure is built up. This takes approximately three minutes.

3
3
2

1

02_Geraetebeschreib_en.fm Seite 10 Mittwoch, 27. September 2006 5:12 17