beautypg.com

2 setup checklist, 2 setup checklist -6, 6 1.3.2 setup checklist – Allied Telesis 9700 iMAP User Manual

Page 12

background image

Selecting a Site (Office Installation)

Setup Checklist

ATI 9700 - Installation Guide (Initial Installation of the ATI 9700)

1-6

1.3.2 Setup Checklist

ATI provides and ships certain parts with each order.

Table 1-3

lists the items that are to be provided by ATI.

Table 1-4

lists the items that are to be provided by the customer.

Note:

When installing the shelf with the E-0002-C PEM8, ensure that 6 AWG is used for the
installation.

TABLE 1-3

ATI Item checklist

Item

Quantity

Description

Machine
screws

4 bags

Four bags containing parts are located inside the chassis box:

1. M6 screws

2. 24x1/2 in. screws - These and M6 screws are used to bolt the shelf into the
rack.

Note:

The number of screws used depends on how the shelf
is mounted.

3. Grounding kit (nuts and washers)

4. M3 (8mm length) screws (7)- Used to install the PEM8

channel stand-
offs

as needed
for center
mount

Optional (Used for chassis center mounting)

rack panel
adapters

as needed
for chassis
mounting in
23 in. racks

Optional (Used for chassis mounting in 23 in. rack)

Air filter

1

Air filter unit. Note that the air filter may come mounted in the chassis.

TABLE 1-4

Customer Item Checklist

Item

Quantity

Description

MGMT cable

1

RJ-45, connectorized at one end, CAT 5

Bay Power
Cabling

6 AWG, length determined by shelf position and how cabling is routed

Alarm cable

3

RJ-45, connectorized at one end, CAT 5

Voltmeter

1

Used to check the voltage at the terminal block

Double crimp
terminal

as needed

Required for ground wiring.