De-energize/shutdown, Figure 33, Shutdown procedures – Outback Power Systems FLEXpower ONE One Fully Pre-Wired Single Inverter System Installation Manual User Manual

Page 48: Operation

background image

Operation

De-energize/Shutdown

WARNING: Lethal Voltage

Review the system configuration to identify all possible sources of energy.
Ensure ALL sources of power are disconnected before performing any
installation or maintenance on this equipment. Confirm that the terminals are
de-energized using a validated voltmeter (rated for a minimum 1000 Vac and
1000 Vdc) to verify the de-energized condition.

WARNING: Burn Hazard

Internal parts can become hot during operation. Do not remove the cover
during operation or touch any internal parts. Be sure to allow them sufficient
time to cool down before attempting to perform any maintenance.

46

900-0095-01-00 Rev A

Figure 33

Shutdown Procedures

1. Open the PV Breakers.

1

2. Open the AC Breakers.

2

3. Open the DC Breaker for the Battery.

4. Using a digital volt-meter, verify 0 Vdc on the

Battery terminals of the Inverter

(i.e., place voltmeter leads on

and

in

Figure 34

on page 47).

5. Using a digital volt-meter, verify 0 Vdc on the

PV terminal

(i.e., place voltmeter leads on

and

in Figure 34

on page 47).

6. Using a digital volt-meter, verify 0 Vac on the

AC Breakers

(i.e., Place voltmeter leads on

6+

and

6–

in

Figure 34

on page 47).

2

A

3

Outlets are model-dependent.

120 V systems will have a 120V outlet,

230 V Systems will have a 230 V outlet.

A

1