beautypg.com

Outback Power Systems FLEXpower ONE One Fully Pre-Wired Single Inverter System Installation Manual User Manual

Page 12

background image

Table of Contents

10

900-0095-01-00 Rev A


List of Figures

Figure 1

FLEXpower ONE System Overview ............................................................................................................................11

Figure 2

Basic Components of a FLEXpower ONE System..................................................................................................12

Figure 3

On-Grid Applications (Example) .................................................................................................................................13

Figure 4

Off-Grid Applications (Example) .................................................................................................................................14

Figure 5

Grid-Interactive Applications (Example) ..................................................................................................................14

Figure 6

Clearance and Access Requirements ........................................................................................................................18

Figure 7

Dimensions ........................................................................................................................................................................19

Figure 8

Conduit and Knockout Preparation...........................................................................................................................20

Figure 9

Installing the Mounting Bracket .................................................................................................................................22

Figure 10

Attaching the Mounting Plate to the Mounting Bracket ...................................................................................23

Figure 11

Removing the Covers .....................................................................................................................................................24

Figure 12

Wiring and Breaker Compartment.............................................................................................................................25

Figure 13

Ground Connections ......................................................................................................................................................27

Figure 14

Battery Connections with the FLEXnet DC Monitor.............................................................................................28

Figure 15

Battery Connections without the FLEXnet DC.......................................................................................................29

Figure 16

PV Connections with a FLEXnet DC Monitor ..........................................................................................................30

Figure 17

AC IN Connections...........................................................................................................................................................31

Figure 18

AC OUT Connections ......................................................................................................................................................32

Figure 19

Energize Procedures .......................................................................................................................................................33

Figure 20

Functional Test Procedures for Initial Startup........................................................................................................34

Figure 21

Replacing the Raceway and FLEXmax 80 Front Cover........................................................................................35

Figure 22

Replacing the Inverter’s AC Terminal Access Cover.............................................................................................35

Figure 23

Replacing the AC Enclosure Front Cover.................................................................................................................36

Figure 24

Replacing the AC Enclosure Top Cover....................................................................................................................36

Figure 25

Replacing the DC Enclosure Front Cover.................................................................................................................37

Figure 26

Replacing the DC Cover.................................................................................................................................................37

Figure 27

MATE2 Setup Screen (Page 1) .....................................................................................................................................40

Figure 28

MATE2 Setup Screen (Page 2 and 3) .........................................................................................................................41

Figure 29

Inverter Setup Screen – Selecting AC Source.........................................................................................................42

Figure 30

Accessing the Advanced Menus.................................................................................................................................43

Figure 31

Setting Battery Amp-hours and Return Amps .......................................................................................................44

Figure 32

Setting Input Source and Current Limit ...................................................................................................................45

Figure 33

Shutdown Procedures....................................................................................................................................................46

Figure 34

Functional Test Procedures to Confirm the Unit is De-energized...................................................................47

Figure 35

FLEXpower ONE with FLEXnet DC Monitor and GFDI .........................................................................................61

Figure 36

FLEXpower ONE with FLEXnet DC Monitor Only (No GFDI)..............................................................................62

Figure 37

FLEXpower ONE with GFDI Only (no FLEXnet DC Monitor) ..............................................................................63

Figure 38

FLEXpower ONE (no FLEXnet DC Monitor or GFDI) .............................................................................................64