Installation
Functional Test/Commissioning
Pre-startup Procedures
1. Double-check all wiring connections.
2. Inspect the enclosure to ensure no tools or debris has been left inside.
Energize/Startup
1.
Using a digital volt-meter (DVM), verify 24 or
48 Vdc on the Battery terminals (i.e., place
DVM leads on and
in Figure 20).
Confirm that the voltage is correct for the
inverter model. Confirm the polarity.
1-
1+
3
900-0095-01-00 Rev A
33
2.
Close the DC Breakers from the battery bank
to the inverter.
2
3.
Close the AC Output Breakers.
4.
Using a digital voltmeter, verify 120 Vac on
the AC Breakers (i.e., place voltmeter leads
on
4+
and
4–
5.
Close the AC Input Breakers.
5
6.
Using a digital voltmeter, verify 120 Vac on
the AC Breakers (i.e., place voltmeter leads
on
6+
and
6–
7.
Close the PV input Breakers.
7
8.
Using a digital voltmeter, verify the voltage
on the PV terminal does not equal zero
(i.e., place voltmeter leads on
8+
and
8–
9.
Connect a small AC load and test for proper
functionality.
Figure 19
Energize Procedures
2
5
7
CAUTION: Equipment Damage
A
Incorrect battery polarity will damage the inverter.
A
Outlets are model-dependent.
120 V systems will have a 120V outlet,