beautypg.com

Redundant enablement option, Preparing the server for installation – HP ProLiant ML350e Gen8 Server User Manual

Page 85

background image

Hardware options installation 85

b.

Return the server to an upright position.

21.

For rack models, do the following:

a.

Install the rack bezel (on page

25

).

b.

Install the access panel (on page

26

).

c.

Slide the server back into the rack.

22.

Connect each power cord to the server.

23.

Connect each power cord to the power source.

24.

Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.

25.

Do one of the following:

o

For tower models, install the bezel ("

Install the tower bezel

" on page

23

).

o

For rack models, if removed, install the security bezel ("

Security bezel option

" on page

47

).

Redundant Enablement Option

Preparing the server for installation

1.

Do one of the following:

o

For tower models, open and remove the bezel ("

Remove the tower bezel

" on page

22

).

o

For rack models, if installed, remove the security bezel (on page

24

).

2.

Power down the server (on page

22

).

3.

Remove all power:

a.

Disconnect each power cord from the power source.

b.

Disconnect each power cord from the server.

4.

Do one of the following:

o

For tower models, place the server on a flat, level surface with the access panel facing up.

o

For rack models, remove the server from the rack and place it on a flat, level surface with the access
panel facing up.

5.

Remove the access panel (on page

25

).

6.

Remove the system air baffle (on page

30

).