beautypg.com

Operations, Power up the server, Power down the server – HP ProLiant ML350e Gen8 Server User Manual

Page 22: Remove the tower bezel

background image

Operations 22

Operations

Power up the server

1.

Connect each power cord to the server.

2.

Connect each power cord to the power source.

3.

Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.

Power down the server

Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.

IMPORTANT:

When the server is in standby mode, auxiliary power is still being provided to the

system.

To power down the server, use one of the following methods:

Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby
mode.

Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.

Use a virtual power button selection through iLO 4.
This method initiates a controlled remote shutdown of applications and the OS before the server enters
standby mode.

Before proceeding, verify the server is in standby mode by observing that the system power LED is amber.

Remove the tower bezel

This server has a removable bezel that must be unlocked and opened before accessing the drives. The bezel

must be kept closed during normal server operations.