6.

Ensure both brackets are level and tighten all hardware.

7.

Carefully lift and insert the UPS onto the brackets and push the unit
back into the cabinet until the mounting holes in each flange align with
the corresponding holes in the cabinet.

8.

Secure the front panel of the UPS to the cabinet (see Figure 3-8 for
correct holes) using two SST flat-washers and screws.

9.

Connect the UPS power cord to the AC power strip.

Figure 3-8. UPS bracket RETMA and metric hole locations (rear)

Power and SCSI Cable Connection
Procedures

This section contains the power and SCSI cabling procedures for a single or
multiple device expansion shelf subsystem installation. Each procedure
describes how to connect the controller shelf to the device expansion shelves,
the host system, the UPS, and the maintenance PC. Your controller and device
expansion shelf shipment contains all of the power, serial control, and SCSI
data cables required to connect and configure your system. These cables, along
with two Trilink adapter connectors allow you to create a single or multiple
storage subsystem as shown in Figures 3-1 through 3-4.

The section is divided into four procedures that describe how to connect a
single-or multiple-shelf configuration. Each is supported by a wiring diagram
and is independent of the other three. Proceed to the procedure that applies to
the number of device expansion shelves you are connecting to the controller
shelf.