beautypg.com

Verifying proper operation, Returning the failed component, Installing a power supply – HP 3000 Enterprise Virtual Array User Manual

Page 99

background image

2.

Connect the power cord to the power supply and engage the cord lock.

Figure 45 Installing a power supply

Verifying proper operation

After replacing the power supply or blower, check the following to verify that the component is operating

properly:

NOTE:

It may take up to 10 minutes for the component to display good status.

Make sure the blower begins operating immediately.

The status indicator should be on.

From HP Command View EVA:
• Navigate back to the component and check the status. It should be

.

• Turn off the locate function by clicking Locate > Locate Off.

Returning the failed component

Follow the return instructions provided with the new component.

HP StorageWorks 3000/5000 Enterprise Virtual Array user guide (VCS 4.xxx)

99