KROHNE IFC 090 Converter EN User Manual
Page 18
3/1
3 Start-up
3.1 Switch-on and measurement
•
Before powering the system, please check that it has been correctly installed according
to Sect. 1 and 2.
•
The flowmeter is delivered ready for operational use. All operating data have
been factory set in accordance with your specifications.
Please refer to Sect. 3.2 “factory settings”.
•
Power the unit, and the flowmeter will immediately start process flow
measurement.
Basic version, signal converter IFC 090 / B
•
A light emitting diode (LED) under the cover of the electronic section shows the
measurement status. Remove the cover using the special wrench.
LED flashing . . .
green:
measurement correct, everything all right.
green / red: momentary overdriving of outputs
and/or A/D converter.
red:
fatal error, parameter error or hardware fault,
please consult factory.
•
Refer to Sect. 6.2 for operator control of the “basic version”.
Display version, signal converter IFC 090 / D
•
When powered, the display shows in succession: START UP and READY.
This is followed by display of the current flow rate and/or the current totalizer count
on either a continuous or alternating basis, depending on the setting under Fct. 1.04.
•
Refer to Sect. 4 and 5 for operator control of the “display version”.