Power and control cables, Configuration, Figure 2.33 – Fire-Lite ECC-50/100E Emergency Command Center User Manual

Page 51: Figure 2.33), Power and control cables configuration

background image

Emergency Command Center Manual —

P/N LS10001-000FL-E:A 4/10/2013

51

Installation of Option Modules

Installation

Power and Control Cables

Configuration

Enable Switches, SW6 & SW7

SW6 must be enabled. Do not enable SW7.
Switches come from the factory disabled.
Note that the board is installed upside-down.

Pay close attention when setting switches.

Figure 2.35 shows the amplifier in its installed

position, not the actual silk-screening on the

board.

FAIL TEST Switch, SW4

This switch is not used. It should always be set

to “Normal”.

J12

TB15

J9

RTZM

Rev.

ECC-MCB-PCA

P1

J12

TB15

J9

+-

RTZM

Rev.

ECC-MCB-PCA

1. Attach four

standoffs (p/n

42227) at

locations

indicated.

2. Align
amplifier over
standoffs.
Attach with four
screws.

3. Attach power
harnesses
(included with
amplifier - refer
to Figure 2.34):

Power and

Control Harness

Connections

Amplifier

Main Control Board

• J1 on amplifier to J10 on ECC
• J2 on amplifier to J11 on ECC

J2

J1

J10 J11

Figure 2.33 ECC-50W-25/70V Installation

e

c

c

5

0

.w

m

f

b

d

a

m

n

t.

w

m

f

Control cable

p/n 75690

Align tab with notch in

board connector.

Tab

Power cable

p/n 75689

Align cable connectors

over spaces and pins.

Align where
there is no pin.

Figure 2.34 Control and Power Cables

Figure 2.35 Enable Switches

SW6 is shown enabled.

Do not enable.

Figure 2.36 FAIL TEST Switch