beautypg.com

7 ecc-loc local operator console, Ecc-loc local operator console – Fire-Lite ECC-50/100E Emergency Command Center User Manual

Page 41

background image

Emergency Command Center Manual —

P/N LS10001-000FL-E:A 4/10/2013

41

ECC-LOC Local Operator Console

Installation

2.7 ECC-LOC Local Operator Console

Wiring for the Local Operator Console is accomplished between TB24, TB12, and TB22 on the

ECC-50/100 main control board to TB3, TB4, and TB5 on the LOC. If the ECC-LOC is the last

device on the audio and data bus chain, signal terminations are required. For the external data bus,

a removable jumper must be on pins 1 and 2 of JP2 when the LOC is the last device on the chain.

If the ECC-LOC is not the last device, the jumper must be on pins 2 and 3 of JP2 as shown below.

For the external audio riser, when the LOC is the last device, termination ELR-15K must be con-

nected to pins 5 and 6 on TB5. T-taps and multiple home runs to the main control board are not

allowed for the external data bus or the external data riser.

B

A

+

-

-

+

-

+

B

A

+

-

+

-

+

-

B
A
B
A

main control board

LOC display board

TB24

TB12

TB22

TB3

TB4

TB5

external operator interface power - 24VDC

external data bus

external audio riser

to next operator interface or

amplifier (or, if last device,

signal termination ELR-15K)

to next operator

interface or amplifier

lo

c

w

ir

e

b

.w

m

f

Figure 2.22 Local Operator Console Wiring (Class B/Style Y)

TB2

JP2

(shown jumpered

on pins 2 and 3)

This manual is related to the following products: