beautypg.com

General maintenance – A.O. Smith HW 610 User Manual

Page 45

background image

45

At the time of removal of an existing boiler, the following steps

shall be followed with each appliance remaining connected to

the common venting system placed in operation, while the other

appliances remaining connected to the common venting system

are not in operation.

Seal any unused openings in the common venting system.

Visually inspect the venting system for proper size and horizontal

pitch and determine there is no blockage or restriction, leakage,

corrosion and other deficiencies which could cause an unsafe

condition.

Insofar as is practical, close all building doors and windows and

all doors between the space in which the appliances remaining

connected to the common venting system are located and other

spaces of the building. Turn on clothes dryers and any appliance

not connected to the common venting system. Turn on any exhaust

fans, such as range hoods and bathroom exhausts, so they will

operate at maximum speed. Do not operate a summer exhaust fan.

Close fireplace dampers.

Place in operation the appliance being inspected. Follow the

lighting instructions. Adjust thermostat so appliance will operate

continuously.

Test for spillage at the draft hood relief opening after 5 minutes of

main burner operation. Use the flame of a match or candle, or smoke

from a cigarette, cigar or pipe.

After it has been determined that each appliance remaining

connected to the common venting system properly vents when tested

as outlined above, return doors, windows, exhaust fans, fireplace

dampers and any other gas-burning appliance to their previous

condition of use.

Any improper operation of the common venting system should be

corrected so the installation conforms with the National Fuel Gas Code,

ANSI Z223.1 and/or CAN/CSA B149, Installation Codes. When resizing

any portion of the common venting system, the common venting system

should be resized to approach the minimum size as determined using

the appropriate tables in Appendix F in the National Fuel Gas Code,

ANSI Z223.1 and/or CAN/CSA B149 Installation Codes.

REMOVAL OF EXISTING BOILER FROM A COMMON VENTING SYSTEM

GENERAL MAINTENANCE

These boilers are designed to give many years of efficient and

satisfactory service when properly operated and maintained.

To assure continued good performance, the following

recommendations are made.

The area around the unit should be kept clean and free from lint and

debris. Sweeping the floor around the boiler should be done carefully.

This will reduce the dust and dirt which may enter the burner and

pilot air passages, causing improper combustion and sooting.

THE FLOW OF COMBUSTION AND VENTILATION AIR TO THE

BOILER MUST NOT BE OBSTRUCTED.

THE BOILER AREA MUST BE KEPT CLEAR AND FREE

FROM COMBUSTIBLE MATERIALS, GASOLINE, AND OTHER

FLAMMABLE VAPORS AND LIQUIDS.

Any safety devices including low water cutoffs used in conjunction

with this boiler should receive periodic (every six months) inspection

to assure proper operation. A low water cutoff device of the float

type should be flushed every six months. All relief valves should be

inspected and manually operated at least twice a year. More frequent

inspections may be necessary depending on water conditions.

Periodic checks, at least twice a year, should be made for water

and/or gas leaks.

More frequent inspections may be necessary depending on

water conditions.

The boiler mounted gas and electrical controls have been designed to

give both dependable service and long life. However, malfunction can

occur, as with any piece of equipment. It is therefore recommended

that all components be checked periodically by a qualified serviceman

for proper operation.

MANUAL RESET HIGH LIMIT SWITCH CONTINUITY TEST
Do not depress the switch reset button prior to testing. With the

unit cold, disconnect the leads from the switch. With a multimeter

place a probe on each side of the switch. If the meter reads zero

the switch is good. If you receive an infinite or OL signal, the reason

could be:
1. Protector switch contacts open.
• Depress reset button on switch (switch cannot be reset until

water temperature in the boiler coils drop below 200°F). Meter

should read zero.

2. Defective switch or bad leads.

• With leads attached, depress the switch button. If the meter does

not read zero, the switch is defective and must be replaced.

RELIEF VALVE

The safety relief valve should be opened at least twice a year to

check its working condition. This will aid in assuring proper pressure

relief protection. Lift the lever at the top of the valve several times

until the valve seats properly and operate freely.

DANGER

THE WATER PASSING OUT OF THE VALVE DURING CHECKING

OPERATION MAY BE EXTREMELY HOT. BEFORE OPERATING

RELIEF VALVE MAKE SURE DRAIN LINE IS INSTALLED TO

DIRECT DISCHARGE TO A SAFE LOCATION SUCH AS AN OPEN

DRAIN, TO AVOID SCALDING OR WATER DAMAGE.

WARNING

SHOULD OVERHEATING OCCUR OR THE GAS SUPPLY FAIL

TO SHUT OFF, TURN THE MANUAL GAS CONTROL VALVE TO

THE APPLIANCE.