beautypg.com

Maintenance – Teledyne 7500ZA - Infrared Gas Analyzer User Manual

Page 91

background image

NDIR Gas Analyzer

Maintenance

Teledyne

Analytical

Instruments

75

7. Maintenance

7.1 Daily Check

1. Zero calibration and span calibration

1. Perform zero calibration. For the calibration procedures, refer to

Section 6.8.1 Zero calibration.

2. Following the zero calibration, perform a span calibration. For

the calibration procedures, refer to Section 6.8.2 Span
calibration.

3. Zero/span calibration should be carried out once a week, or as

required.

2.

Flow rate check

1. Sample and purge gas flow rates are as follows:

Sample gas flow :

0.5L/min ± 0.2L/min

Purge gas flow :

About 1L/min

2. Instrument checks and maintenance should be carried out every

day, as required.