beautypg.com

Operation – Teledyne 7500ZA - Infrared Gas Analyzer User Manual

Page 41

background image

NDIR Gas Analyzer

Operation

Teledyne

Analytical

Instruments

25

Operation

4.1 Preparation for operation

Tube and wiring check

• Double-check if tubes of the gas sampling and exhaust ports are

correctly connected.

• Double-check for proper wiring.

4.2 Warm-up Operation and Normal Operation

(1) Operation Procedure

1. Turn ON the power switch on the left side when facing the front

panel of the analyzer unit. The measurement screen will appear
on the front display panel in a few seconds.

2. The instrument warm-up time is about 4 hours after which the

instrument will produce an accurate measurement.

Note: During the warm-up stage, the concentration reading may

be above the upper range limit. When this occurs, the
indication will display as a series of four dashes. However,
this is not an error.

3. During the warm up period, you can set the various instrument

parameters as described in Section 6: Setting and Calibration.

4. After the warm-up period, perform the zero/span calibration as

described in Section 6.8 Calibration.

5. After calibrating the analyzer, introduce sample gas into the

analyzer and allow the lines to purge before accepting the
measurement value.