Installation instructions, Unpacking pre-assembled systems, Installation tools and torques – Burkert Type 8650 User Manual
Page 61: Installation.instructions, . unpacking.pre-assembled.systems, . installation.tools.and.torques
61
2.
INSTALLATION INSTRUCTIONS
NOTE!
Incorrectly installed systems (e.g. inclined tie rods not tightened properly) may leak.
• Prior to start-up, always firmly seal all open attachments and locking devices.
• The blue cover flaps of the individual segments can be removed if required.
• If moving from a cold to a warm environment, do not install the system until it has adjusted itself to the
ambient temperature in order to prevent condensation!
2.1.
Unpacking pre-assembled systems
NOTE!
Important.–.take.module.correctly.out.of.the.packaging!
To prevent damage to the pre-assembled system when taking it out of the packaging, observe the following:
→
Take hold of the system by the pneumatic connection modules and take it out of the packaging (see figure
“Holding points”).
Holding points
Fig. 1:
Holding points for removal of pre-assembled systems
2.2.
Installation Tools and Torques
Application
Type.and.size.of.the.tool
Torque.
Actuation of the locking elements
Plain screwdriver, size 5
-
Screw the clamping bolts onto the supply modules,
screw fitting of terminal module - pneumatic module
Plain screwdriver, size 7
1.3 ... 1.5 Nm
Installation / removal
of the valves with 11 mm station width
Cross-head screwdriver
Size 0
0.2 Nm
Installation / removal
of the valves with 16.5 mm station width
Cross-head screwdriver
Size 1
0.3 Nm
Tightening of the inclined tie rods
Allen key (3 mm)
0.6 Nm
Type 8650
english
Installation