Alpha Technologies XM2, XM2-HV, XM2-HP User Manual
Page 49

3.2
AC Input Voltage Reconfiguration, continued
3.2.2 Reconfiguration from 240Vac to 120Vac, continued
Fig. 3-8, SW2 Settings
5.
Remove the five front panel screws. Lift the transformer module front panel up
and away from the chassis. The front handle and output fuse remain in place.
6.
Reconfigure the PDB to 120Vac input, according to Table 3-2.
• Change Switch 2-4 (SW2-4) to OFF, Switch 2-5 (SW2-5) to OFF
• Change Switch 2-6 (SW2-6) to OFF, Jumper 1 (JP1) to Open (120) and
Jumper 2 (JP2) to Open (120).
Positions of SW2 (-4, -5, -6) are shown for clarity. Do not adjust the other switch positions
during this procedure.
NOTE:
7. Replace the front panel.
8. Install the power supply into the enclosure as outlined in Section 2.1, Installation
Procedure.
ON
4 5 6
120Vac
240Vac
ON
4 5 6
Legend
OFF ON
49
017-805-B0-010 Rev. K2
- AlphaCell GelCell Series (32 pages)
- FXM 650, 1100, 2000 UPS (96 pages)
- Cordex 48-1.2kW (68 pages)
- Radium MiniBay (57 pages)
- Fiber Backhaul Enclosure (FBE) (19 pages)
- FBE2322 Enclosure System (38 pages)
- FlexNet PMR, GMR Series (49 pages)
- Te25xh (38 pages)
- FlexNet MPS48-12M - Technical Manual (33 pages)
- FlexNet MPS48-12M - Quick Start Guide (2 pages)
- FlexNet ELPM 300-48D (25 pages)
- FlexNet FMPS (40 pages)
- FlexPoint AX Series (34 pages)
- FlexPoint FPR1207-F - Technical Manual (18 pages)
- FlexPoint FPR1207-F - Quick Start Guide (2 pages)
- AlphaGen PN-6x-T 7.5kW 48VDC - Installation and Operation Manual (79 pages)
- AlphaGen CE-3x2 5K-T 48Vdc (95 pages)
- AlphaGen PN-6x-T 7.5kW 48Vdc (95 pages)
- AlphaGen 3.5_5.0kW Kohler COM5 (80 pages)
- Security Bar Field For UPE-3, UPE-6, UPE-M3, UPE-M6, PN Series and CE Series (2 pages)
- AMPS80 HP (116 pages)
- 255A Bypass Switch (24 pages)
- AMP24 HP (108 pages)
- FXM350_Micro350 UPS (112 pages)
- CFR 600, CFR 600XT, CFR 1000 (70 pages)
- BPS Series Bypass Switch (36 pages)
- CFR Intelligent Interface Device (54 pages)
- CFR Redundant Control Unit (23 pages)
- CFR 5000, CFR 5000RM (88 pages)
- CFR 3000, CFR 3000RM (86 pages)
- CFR 1500, CFR 1500RM (83 pages)
- CFR 1500, CFR 2000, CFR 2500, CFR 3000 (76 pages)
- Continuity: 1000_2000_3000 (48 pages)
- Continuity Battery Pack (20 pages)
- Continuity: 6K_10K (52 pages)
- Micro, Micro XL, Micro XL3 UPS (99 pages)
- Micro Secure UPS (80 pages)
- Te17 (32 pages)
- Te45 (68 pages)
- Te41, 48V (76 pages)
- Te41, 24V (72 pages)
- Te43 (60 pages)
- AlphaGuard AG-CMT Installation (2 pages)
- AlphaGuard AG-CMT-3SC_4SC-P (2 pages)
- Digital Midtron DM-3200 AT (2 pages)