Basic installation & wiring (continued... ) – Franklin Fueling Systems TS-LS300 AutoLearn Pressure-Based Electronic Line Leak Detector System Users Guide User Manual
Page 24

3
Page
3-6
ELECTRICAL INSTALLATION & WIRING
LS300 User’s Guide
Figure 3-4 Dispenser Hook and Console Interface
Photo 3-4
Hook Inputs
Note, the color of
some components
may be different
depending
on Supply
Manufacturer
+V = 15 VDC OUTPUT
RED
RED
Dispenser
Hook
Isolation
OUTPUT:
DISPENSER HANDLE
INPUTS:
SUPPLY
RETURN
RETURN
BLK
BLK
SUPPLY
RETURN
RED
BLK
SUPPLY
RED
TS-LS300 Auto-Learn Console
HOOKS
Ch1, Ch2
Ch3, Ch4
HOOK INPUT:
Submersible
Pump
Controller
TS-TPI
PCB
POWER
IN
TRANSDUCER'S
Ch1, Ch2
Ch3, Ch4
OPTIONAL
BLK
L1
L2 (240 v) or
N (120 v)
GROUND
GROUND
Electrical
Power
Panel
WHT
GRN
GRN
SIGNAL
IN
GROUND
GROUND
OUT
+V
BLK
SHIELD
RED
RED
WHT
R
E
T
U
R
N
S
U
P
P
L
Y
DISPENSER
HANDLE
SWITCH
SHIELD
LSU300
TRANSDUCER
LINE / TANK
HOOK =
CHANNEL # N
BLK
SHIELD
BLK
RED
WHT
RED
WHT
120 v
240 v
BRN
BLU
GRN/YEL
GRN/YEL
Basic Installation & Wiring (Continued... )
7.)
Wire Dispenser Hooks (switches) to the Hooks terminals inside the LS300 console, see Figure 3-4.
A.)
Follow these associations accurately when wiring.
Hook 1 must operate the STP at Tank/Line 1, Hook 2 for Tank/Line 2,
Hook 3 for Tank/Line 3, Hook 4 for Tank/Line 4.
B.)
Wire the Hook Inputs to the proper Channels, to Turbine Pump Controllers, and to
Dispenser Hook Isolators as shown in Figure 3-4.
- S940 (8 pages)
- Data Modem / Data Fax Modem for Tank Sentinel, AutoStik, & BulkStik ATGs (1 page)
- Tank Sentinel (TS-1001, 2001, 504, & 508) Setup Programming Guide (184 pages)
- Tank Sentinel (TS-1001, 2001, 504, 508 & 750) Setup Programming Guide (184 pages)
- Main System Board for Tank Sentinel, AutoStik, BulkStik ATGs (4 pages)
- TS-ROM2 (8 pages)
- Memory Backup Battery for Tank Sentinel, AutoStik, & BulkStik ATGs (2 pages)
- Tank Sentinel Quick Reference Guide (2 pages)
- Tank Sentinel (Except TS-2001), AutoStik Jr, BulkStik, AutoStik II (1-4 Ch) Display & Keypad Assembly (P/N 010-0087) (1 page)
- Tank Sentinel (TS-1001, 2001, 504, 508 & 750) Operators Guide Rev. D (100 pages)
- Tank Sentinel, AutoStik, BulkStik Printer Assembly (P/N 020-3050) (1 page)
- Tank Sentinel (TS-1001, 2001, 504, 508 & 750) Operators Guide Rev. C (100 pages)
- Tank Sentinel (TS-1001, 2001, 504, 508 & 750) Installation (98 pages)
- TS-1001, BulkStik, AutoStik (except AutoStik II 8Ch) Ribbon Cable (P/N 600-0077 & 600-0032) (1 page)
- TS-STS Sump Test System Kit (8 pages)
- TS-DTU Noise Suppression Cables TS-DRK (10 pages)
- Console DTU (Data Transfer Unit) (4 pages)
- TS-DTU Data Transfer Unit Dispenser Retrofit Manual (40 pages)
- Colibri One Pulse Relay Rule Setup (1 page)
- Colibri CL6 Installation Guide (12 pages)
- Colibri CL6 Setup and Operators Guide (32 pages)
- Colibri System Board Replacement (2 pages)
- Colibri Quick Reference (2 pages)
- Colibri: Connecting a T5 Series Fuel Management System or Colibri Tank Monitor to an ALVIC SCS3 Point of Sale System (3 pages)
- T5 Series Fuel Management System Installation Guide (30 pages)
- TS-550/TS-5000 consoles Secondary Containment Monitoring (28 pages)
- TS-550/TS-5000 Retrofit Printer Installation (1 page)
- T5 Series Fuel Management System Operators Guide (46 pages)
- T5 Series Fuel Management System Operators Guide (48 pages)
- T5 Series Fuel Management System Programming Guide (66 pages)
- T5 Series Fuel Management System Quick Reference Guide (2 pages)
- T5 Retrofit LCD Display Installation (1 page)
- T5 Tank Sentinel Programming Guide (48 pages)
- TSSP-TMPTR Thermal Printer (8 pages)
- TS 550 evo Fuel Management System Operators Guide (48 pages)
- TS 550 evo Fuel Management System Installation (28 pages)
- TS 550 evo Fuel Management System Quick Reference Guide (2 pages)
- TS 550 evo Fuel Management System Programming Guide (54 pages)
- TS-550 evo MODBUS Installation & Setup (22 pages)
- TS-LLD Changing the TS-LLD Control Unit (1 page)
- TS-LLD Changing the TS-LLD LSU Filter Screen or O-Ring (1 page)
- TS-LLD Leak Detection Sensor – Cleaning & BriteSensor Recovery (2 pages)
- TS-LLD Field Verification : Functional Testing of the INCON TS-LLD (2 pages)
- TS-LLD Changing the TS-LLD Control Unit Faceplate (1 page)
- TS-LLD Changing the TS-LLD 1 microfarad Line Filter Capacitor (1 page)