YSI P 700 IQ Analyzer User Manual
Page 46

46
ba76133e01
09/2013
P 700 IQ
Commissioning steps
on the IQ S
ENSOR
N
ET
terminal
The following steps are carried out on a terminal in the IQ S
ENSOR
N
ET
system. Instructions on operation are given in the respective
IQ S
ENSOR
N
ET
system operating manual.
9
Using <>, select the P 700 IQ in the measured value display.
10
Using
The maintenance condition is activated.
11
Confirm the maintenance condition with
The calibration and service menu is displayed. See Fig. 3-22,
46.
Fig. 3-22: Calibration and service menu
12
Carry out the Fill the system function.
All tubes of the P700IQ-PO4 are automatically filled with the con-
nected solutions and sample liquid.
13
Follow the instructions on the display.
Starting the
measurement
14
Carry out the Start measuring function.
The measured value determination takes approx. 5…7 minutes.
A note is displayed.
15
Confirm the start of the measurement with
16
Carry out the Exit SERVICE function.
or
Exit the calibration and service menu with
A note to end the maintenance condition is displayed.
If the measurement is delayed because a function with
higher priority (e.g. automatic cleaning or calibration) is car-
ried out before, this is indicated by a message such as
WAIT CLEAN.