beautypg.com

Pre-installation check installation site check – Bell & Gossett 176R0649C Technologic 502 Series Pump Controller User Manual

Page 10

background image

10

Section 2 Pre-installation

1. Compare model number to what was

ordered.

2. Ensure each of the following are rated for

same voltage:

• Power line

• Drive

• Option panel

• Motor

3. Ensure that option panel output rating is

equal to or greater than motor total full

load current for full motor performance.

• Motor power size and option panel must

match for proper overload protection.

• If panel rating is less than motor, full motor

output cannot be achieved.

4. Check motor wiring:

• Any disconnect between drive and motor

should be interlocked to drive safety

interlock circuit to avoid unwanted drive

trips.

• Do not connect power factor correction

capacitors between drive and motor.

• Two speed motors must be wired

permanently for full speed.

• Y-start, -run motors must be wired

permanently for run.

Pre-installation Check

Installation Site Check

• Because the option panel relies on the

ambient air for cooling, it is important to

observe the limitations on ambient air

temperature. Derating starts above 40°C

(104°F) and 3300 feet (1000m) elevation

above sea level.

• It is important with backpanel mounted units

to check support strength. Make sure that

the proper mounting screws or bolts are

used.

• Keep the option panel interior free from dust

and similar dirt. In construction areas, if the

unit is not powered, provide a protective

covering. It is important to ensure that the

components stay as clean as possible. It

may be necessary to clean the interior once

construction is completed.

• Keep wiring diagrams, drawings and

manuals accessible for detailed installation

and operation instructions. It is important

that the manuals be available for equipment

operators.