Mounting, Figure 1, Probe mounting with adapter flange or r2” adapter – M&C TechGroup SP2020-H_C_I_BB_F Operator's manual User Manual
Page 13
13
Gas sampling and gas conditioning technology
2-1.1.6.1-ME
12
MOUNTING
M&C SP2020.. probes are designed for stationary use and if properly selected and mounted a long
service life and minimum maintenance are guaranteed.
Remove the probe's protection shield after opening the two clamping devices.
Turn the U-bolt at the front end of the filter receptacle several times to the left until the retain-
ing bolt can also be turned sideways to the left.
Remove the filter receptacle from the probe and check whether the filter element is screwed
on tightly.
Then replace the filter receptacle, place the retaining bolt in its original position and tighten the
U-bolt.
Remove the heat-conducting jaws at the sample gas outlet after loosening the knurled-head
screw.
In order to connect the sample line, screw in a suitably sized threaded connector with a ¼"-
NPT connecting thread using PTFE sealing tape.
N O T E !
Make sure that the connection is leakproof!
Screw either the probe tube or prefilter supplied directly or using an extension tube into the ¾"
inner thread in the flange of the probe with the ¾" flat gasket and tighten.
If the heated probe tube type SP30/35 or the ceramic prefilter type V12 is used, then the
probe is to be screwed to their flange (with welded threaded bolt). First insert the flange seal
between the two flanges.
If the probe connection does not correspond to the standard flange connection , then the op-
tionally supplied adapter flange should be mounted to the probe in the same way.
3
“ 150 lbs
Figure 1
Probe mounting with adapter flange or R2” adapter