beautypg.com

Maintenance, 15 maintenance, N o t e – M&C TechGroup PSS-10_1 Operator's manual User Manual

Page 17

background image

17

Gas sampling and gas conditioning technology

4-2.1.2-ME

15

MAINTENANCE

Before the maintenance work is carried out, it is necessary that the specific safety procedures
pertaining to the system and operational process be observed!

W A R N I N G !




Dangerous voltage. It is necessary to take the equipment off the

mains before any assembly, maintenance or repair work is
carried out.


The frequency of the maintenance work depends on the operational process and can therefore only
be determined in each individual case. Maintenance instructions pertaining to individual components
can be found in the instruction manual for individual components.

All parts which require maintenance work are housed in the gas conditioning system in such a way so
that they are easily accessible. These are:

The filter element of the preliminary filter FP-2T.

N O T E !

In order to protect the analysers which have been additionally
connected, it is recommended that in the event of a condensation
irruption the moist filter elements be replaced.


The preliminary filter for the peristaltic pump PF2. If the condensate contains particle residue, the

preliminary filter should be replaced at regular intervals. The ‘one-way’ filter is situated in the
suction side of the pump hose and can be easily replaced;

Hoses of the Condensate pump SR25.1. These should be checked every six months and, if

necessary, replaced (consult the instruction manual in the Appendix);

Diaphragm of the sample gas pump N9KPE. These should be checked every six months and, if

necessary, replaced;