beautypg.com

M&C TechGroup SP3200 Operator's manual User Manual

Page 23

background image

2-1.3.9-ME

Gas sampling and gas conditioning technology

23




16 SHUTDOWN

Before shutdown, i.e. switching off the heater, the probe should be flushed with a suitable inert gas to pre-
vent condensation of aggressive components of the process gas.



17 SPARE PARTS LIST

Wear, tear and replacement part requirements depend on specific operating conditions.
The recommended quantities are based on experience and they are not binding.

Gas sample probe SP3200 and SP3200V

(C) Consumable parts

(R) Recommended spare parts

(S) Spare parts

Recommended quantity being in opera-
tion [years]

Part No.

Indication

C/R/S

1 2 3

90 F 0126

Filter element F-3SS150, 1.4404, 3 μm, 150 mm

C 6 12 18

90 S 0020

Filter element S-2K150, ceramic, 2 μm, 150 mm

C 6 12 18

93 S 0055

Gasket (30) for filter element, material graphite

R

4

8

12

93 S 0020

O-ring (39) for lid SP3200V, material FPM

R

2

4

8

93 S 0025

O-ring (55) for lid SP3200V, material FPM

R

2

4

8

93 S 0030

Gasket (69) for lid SP3200, material graphite

R

2

4

8

90 S 2072

Gasket for sample tube, 3/4", material graphite

R

1

2

3

90 S 2084

Flange seal DN65PN6 (67mm i.), material graphite

R

1

1

1



18 ANNEX

Drawing SP3200 RS, HEX5-1.08

Drawing SP3200 RS, HEX5-1.08

EC – Declaration of conformity

Further product documentation can be found in the internet under:

www.mc-techgroup.com